Central Heating System

Mr and Mrs Brooks wanted to modernise the existing heating system and free up some valuable space in preparation for a new bathroom to be installed.

TND Lymington carried out a system update with the IDEAL Independent C24 27KW/G

We removed the old boiler

The cylinder cupboard is within the bathroom and taking up 20% of the available space.

Removal of the cylinder and all the associated pipe work renders

The system update utilises main water pressure allowing the storage tanks to be removed and approximately 1 tone of water has been removed from the loft area.

The IDEAL Independent C24 Condensing boiler with horizontal flue providing the hating and hot water for the Brooks Family